Tuesday 5 December 2006

Asking Questions

It is always refreshing going to the gemba – actually walking a value stream all the way through an organization. This is where I learn to collect the questions to think about next. There is no doubt in my mind that all managers should walk their value streams as frequently as possible. By asking the right questions you can quickly discover almost all the things that need to be done. And because everything ends up on the shop floor it also reveals a lot about how management actually thinks. After all the shop floor is a reflection of management!

In one company making good progress with lean, an operator was showing me his daily production instructions. We discussed the problems that were holding him up that day. I then asked how often he was able to complete his daily plan. Without hesitation he replied - never! So what do they do then? They just change tomorrow’s plan! This was very revealing to the senior manager accompanying me, who was the proud architect of the central planning system that was “optimising” production in each operation in each of their plants. This prompted a very interesting discussion when we met the management team later that day. 

In another company I followed a top manager on a whirlwind tour to rally the troops. Accompanied by an army of staff he offered the shop floor team all the assistance they needed to accomplish their work, before he ran off to his next appointment. They looked baffled, because it was clear no one had told him they did not actually have enough work to do – the problem lay elsewhere. They were held up waiting for engineering drawings to arrive and for suppliers to deliver the right parts. Other departments were responsible for sorting out these problems.  

In truth these events could have happened in most of our organizations, and not just in manufacturing. The reality is that as soon you begin asking the five whys across departments the trail goes cold. Because no one is responsible for the value stream as it flows through the organization. Once someone is appointed to be the value stream manager the first thing they need to do is to ask lots of questions. 

One place to start asking questions is with planning or scheduling. Most planners were trained on simulations which assume that if only the world would behave according to the plan things would work out as they should do. To them improving the plan is all about collecting more data, improving data accuracy, getting better forecasts etc. When problems occur they find it difficult to acknowledge the extra volatility their frequent changes to the plan create – which usually make the situation worse and not better.

Toyota starts from a completely different assumption. They assume that even the best processes will continually be subject to frequent interruptions. So they pay a lot of attention to tracking progress in real time and to designing lean response processes to get back on track as quickly as possible – so plans are actually met every day! They also take responsibility for actively leveling and filtering out the noise in orders being passed to operations, in order to create as much stability for them as possible.

And they then go to work on the problems – using the common scientific approach to problem solving through root cause analysis and experimentation, which every manager and engineer learns from the day they join the company. So the second place to ask questions is in operations itself. What are the most frequent causes of interruption in the value stream and is there a problem solving capability ready to solve them? It is staggering how much attention Toyota continues to place on problem solving and on improving the basic stability (right first time on time capability and equipment availability) in every activity.

The third place to ask questions is in the other functions like purchasing, marketing and sales, human resources and engineering. For instance I continue to be amazed how many firms are reluctant to take full responsibility for reconfiguring their supply base and synchronising the operations of their suppliers with their own. Almost certainly they have too many suppliers, who are usually too far away to respond quickly enough. Compressing their end-to-end value streams could remove layers of cost while also minimising its impact on the environment. 

Likewise I am also surprised how many firms are reluctant to challenge their existing distribution channels. Some firms are learning that selling direct to end customers through the web generates additional sales, rather than cannibalising existing channels. They are also learning that listening to customers can show how to eliminate unnecessary costs while improving customer service. Once you begin a win-win dialogue with customers who you know by name the opportunities for improvement are endless. Just watch what happens when Tesco surprises the world with it launches its new convenience retailing format in California early next year.

So the question to think about is who is asking the right questions about how to improve each value stream in your organization? 

I wish you a relaxing Christmas break.

Yours sincerely
Professor Daniel T Jones

Tuesday 7 November 2006

Changing Reasons for Going Lean

Two questions from very different perspectives illustrate how the reasons for going lean are changing. First from Denmark, where a few years ago they were very worried about losing manufacturing jobs to low wage countries to the east. Since then Dansk Industri, the national industry association has run one of the most successful campaigns I have seen to encourage their members to go lean. As a result they are not just retaining manufacturing jobs in Denmark, but they are also running out of people to fill manufacturing jobs! At the same time they liberalised their labour market and unemployment is now very low, even amongst young people.

So their question was “how can we use lean to enable our existing employees to produce two or three times as much in the future?” As population ages and declines in many European countries, as well as in Russia and Japan, this question will be asked more frequently. We are going to need to find ways to produce the goods and deliver the services with less people, or to increase immigration. To achieve this means going beyond streamlining today’s processes and fundamentally redesigning tomorrow’s products, production processes and supply chains.

The second question was from a group of very senior managers from China. They are very enthusiastic to embrace lean, and could see how lean can help make locally produced goods more affordable to local consumers. But they realise that to meet the growing economic aspirations of their citizens they will have to do so in ways that require fewer resources and that create less environmental pollution and greenhouse gasses. So they were interested in “how can they use lean to save resources and avoid pollution?” In other words, how can lean help us also become green?

Lean thinkers are used to tracking the time and effort as a product moves through an organisation and to distinguishing the few minutes it takes to create the value customers are paying for from the month or more that it spends in the organisation. Compressing throughput time from several months to a few days clearly requires far less space and energy. It almost certainly also uses less materials and produces less scrap and obsolescent stock. The ability to produce in line with demand also reduces the inventories (and hence storage space and energy costs) in the pipeline all the way to the end consumer.

But the really significant gains come from compressing supply chains by relocating value creating steps closer together, and where possible also closer to customers. Most organisations are unaware that their products take between three months to a year or more to travel through their current supply chains, often going back and forth across the globe before reaching the customer. Although current wage cost differentials and low transport costs encourage this trend, if we look at total supply chain costs much of this does not make economic sense, as we described in Lean Solutions.

If we also start tracking the energy and emissions from all the processing, storage and transportation steps across supply chains and convert them into units of CO2 per product we will also be able to see the environmental footprint of each end-to-end supply chain, We know from earlier work that the most polluting part of the supply chain for consumer goods is the trip to the supermarket and then storing the goods in our refrigerators and freezers at home until we eat them. But it also shows the choices we will increasingly have to make between for instance air freighting more and more products across the world or enabling people to fly across the world.

Beyond this the next step is to fundamentally rethink the product. A few weeks ago, tucked away inside the Financial Times I noticed a very interesting quote from the R&D Director of Toyota. He announced that their third generation hybrid engine to be launched in three years time would be “half, the size, half the weight and half the cost” of the current generation engine in the Prius. With characteristic understatement he said he thought a lot of people “might be quite surprised at this”.

They should not have been – Toyota began their green technology quest back in 1990 when Eiji Toyoda, the post war genius who built the post war Toyota, questioned whether it was a good idea for Toyota to keep making cars with conventional technology. At each stage Toyota has clearly announced their green intentions in their Annual Report – which everyone ignores - and then fulfilled them! Will the next generation diesel engine make such a dramatic leap in resource use and cost? What preparations are your organisations making to meet the green challenges of the future?

Yours sincerely
Professor Daniel T Jones

Thursday 12 October 2006

Learning to Act

“Learning to See” was the right title for the workbook that introduced the world to value stream mapping. For the first time it taught the world a way to see how to turn a set of separately managed activities into a lean process, through which work could flow with the least possible interruptions. It opened people’s eyes to literally hundreds of opportunities for improvement. As a result the world is full of current state maps and lean activities.

But walking round many organisations doing lean it is still rare to see evidence of well structured procedures to focus people on doing the right things. Often you are taken to see a wall with charts tracking progress over recent months. If that is all you see you know that this is not driving activities on the shop floor and is there simply to impress visiting dignitaries from HQ or outsiders. If you can’t see what needs to be done day by day or hour by hour then neither can employees. 

So to be able to do the right things we need to develop ways in which people can learn not just to see what is happening but also to learn to see what needs to be done. The way to do this is to make everything as visual as possible. Here is my list of the things I would like to be able to see walking round a good lean operation.

I would like to be able to see the pattern of demand for key products or services at the point of use or at the point of sale and to compare this with the pattern of incoming orders received and with the production and shipping instructions issued to the shop floor. This will show everyone the gap between real demand and the volatility created by the way orders are passed on to the plant. It will also show whether the planning systems are levelling orders or creating even more variability in the work to be done. This focuses attention on speeding up the information flow, beginning to align production capabilities with the rate and pattern of demand and on creating the stability essential for continuous improvement. 

Then I want to be able to see the work to be done at every point in the process. Clearing the decks with a good 5S programme is a good start, provided it is audited frequently. But more important is to see the documentation of standard work at every operation, standard maintenance schedules on each piece of equipment and standard material replenishment rules for all supplies, as well as clear evidence that they are being followed by everyone.

Next is good visual management of planned and actual progress at frequent intervals during the shift using some form of progress control charts (or Andon boards). These should where possible be filled in by the team leader and not hidden on a computer. And there should be clear evidence that team leaders and supervisors respond quickly to any slippage, to get back on track as soon as possible. At the side of these charts I would expect to see a record of every problem that occurred during the shift, together with evidence that these were being tracked and resolved using a common problem solving process. 

Absolutely essential is a current and future state map of the value stream. This needs to be tied to an action plan which shows the steps being taken to get to the future state, together with an implementation plan that is regularly audited by management. This might be accompanied by a map of the whole end-to-end value stream showing current performance and progress towards improvement targets in every organisation across this value stream. Modern communications should make it possible to update this information very frequently. 

Finally I look for a clear statement of the high level objectives of the organisation and a deployment mechanism to make sure every improvement action is aligned and supports the desired direction. 

Making everything visual is not always easy. Some senior managers are used to hiding much of this information because knowledge is power. Others see it as undermining the authority of the senior manager or expert who is expected to know all the answers. Good lean management recognises that making progress and problems visible is the most powerful way of engaging every employee in improving the performance of the organisation. 

Yours sincerely
Professor Daniel T Jones

Wednesday 13 September 2006

Value Stream Management

Returning from the summer break is the right time to take a fresh look at your lean initiatives. Are they being led by the right people and are they realising the true potential of lean in your organisation, and up and down your value streams? There is still a lot of confusion about what value stream management really involves.

Most organisations have recognised that implementing lean on the shop floor or in a department like finance is the responsibility of the line management in that department. They need support from a lean promotion office, but must do the hard work themselves for it to stick, because it involves changing the thinking about how employees work together as much as moving things around. 

But end-to-end value streams almost always cross several departments and several organisations on their way to the end customer. Yet it is still rare to find a value stream manager responsible for creating a value stream that flows out of a set of separately managed activities, or someone responsible for sustaining and improving the flow thereafter. Yet we know that if no one is responsible nothing actually happens. 

The one place you may actually find such a person is leading a project to design a next generation product. In Toyota this is the job of the Chief Engineer. They are responsible for the success of their product family through several product generations and report through the Office of Chief Engineers to the top of the company. Interestingly they have few staff reporting directly to them. Most of the staff report to their function or department heads. So the Chief Engineer must articulate a case for the resources necessary to get the next product designed from all these department heads, including marketing, purchasing and production etc. 

But, however radical the design leap being attempted, the task is essentially one of managing a new variant through an existing development system. Where you see a more radical leap is when Toyota is designing a completely new product line – like the original Lexus, the first hybrid Prius or the low cost vehicle for developing countries. Here you see a much bigger activity designing the new vehicle and the entire production system to build it (for several product generations over a couple of decades). This redesign activity reaches back up each supply chain to raw materials, through as many as 26 different operations. It amazes me that many organisations still do not accept the need to take responsibility for designing their supply base in this way. 

When it comes to trying to create a value stream that flows through several different departments for the first time then we need a value stream project leader to lead the charge. Like the Chief Engineer they do not need a big staff reporting to them. They have to make the case for the involvement and resources from all the departments involved and they have to report to and get the backing of top management to make the necessary radical changes. 

The next question is who leads and improves this value stream once it has been created? What knits together a sequence of activities across a value stream? Not the physical flow – this is an outcome of a previous process – but the information flow coming back from the customer to the pacemaker process. So the answer is that the management of existing value streams is actually the responsibility of a lean planning and scheduling function, like the Production Control and Logistics Department at Toyota. Not surprisingly PC&L is at the heart of making the Toyota Production System work, yet less attention has been paid to how it actually operates than to physical operations. 

Value stream management of an existing value stream starts with levelling the flow of orders coming from the customer – acting as a harbour wall to dampen rather than amplify order signals being passed upstream. Then it involves deciding where the pacemaker should be for both the products made to replenishment pull and for the build-to-order products made to sequential pull. Then it is about releasing small quantities of orders frequently to establish a common rhythm across the value stream so products flow quickly and activities come to match the rate and pattern of demand as closely as possible.

Wherever we turn the weak link in our lean activities is the way variability in the information flow is amplified and passed upstream. As long as this is not addressed it will be difficult to create the stability necessary to enable products or patients to flow. Maybe it is time to take a fresh look at the leadership of your value stream redesign activities and at how your planning and scheduling department will manage your value streams on an ongoing basis. 

Yours sincerely
Professor Daniel T Jones

Tuesday 1 August 2006

Right-sized Technologies

I have always thought that lean is much more than improving the efficiency of existing equipment, factories, supply chains, hospitals and service facilities. Lean teaches us to learn to see and improve the processes we are responsible for. It also challenges us to look up and out and cooperate with others to streamline the whole process from end to end, often across several organisations. 

But ultimately lean is about re-examining the end product or service being delivered to customers. Does it really meet their needs at an acceptable cost without wasting their time? And is it sustainable and can it continue to generate an adequate return on investment? If we are honest we would have to conclude that in many cases it does not – we are actually delivering the wrong product through the wrong facilities in the wrong place using the wrong equipment. Our business model is actually a relic of the era of mass production and mass consumption.  

Recognising this dilemma does not solve it! One of the key constraints may be the technology – which is still being designed by engineers resolutely focused on developing the next bigger, all-singing all-dancing piece of equipment. Other constraints may be the drag of existing assets and careers tied to the existing business model. 

However lean engineers are always thinking about developing right-sized tools and lean entrepreneurs are always thinking about how these might be used in new business models that ultimately replace existing providers. We can see similar opportunities in the three great growth industries of our time - transportation, communications and healthcare. 

One of the examples readers remember from Lean Thinking is the holiday flight to Crete, which took 13 hours door to door for 7 hours of actual travel time. Very little has changed about the process of flying on holiday in the last decade – except you can do it more often, from more places, to more destinations and for a lot less money. You just squeeze your knees between the seats, switch off with a good book and look forward to getting there.

Things have not got much better when we travel on business. In some cases they have got worse – it is a nightmare trying to schedule convenient connections between medium sized cities in Europe - and a growing hassle connecting through massive hub airports. I just spent five days getting up before the crack of dawn and taking two flights via hubs, in order to do a day’s work. Smaller jets carrying business travellers are now relegated to distant parking stands and often, after two bus trips and fighting my way through the terminal, I end up boarding the plane next to one I just left! In an exceptionally crazy 70 hour week I did 23 hours of valuable work – and then spent the weekend recovering my sanity!

But help is on the way. Video conferencing is getting better all the time – making some trips unnecessary. But equally the advent of the new very light jets promises to usher in a new era for the business traveller. In Lean Solutions we showed how point-to-point on-demand air taxi operations from local airports could save us all a lot of time and hassle. The Eclipse, the Hondajet and others from Cessna and Embrair are just the beginning of the story. Building and financing a viable business model and the necessary air traffic infrastructure come next. However the impact on the existing airlines and airport operators is likely to be profound. 

This is a similar story to what has happened in communications – the PC replaced the mainframe and mobile operators are now challenging old telecom monopolies. I think we are on the threshold of a similar revolution in healthcare delivery. 

There is a growing recognition that bringing diagnosis and treatment closer to patients rather than centralising them in big general hospitals will improve outcomes for many while saving time and cost. Health entrepreneurs and even retailers are thinking about new healthcare business models. This in turn depends on equipment providers developing smart, right-sized diagnostic and treatment equipment that can be used for self-diagnosis in the home or in local treatment centres. Existing equipment suppliers still seem wedded to bigger machines. Who is going to provide the right-sized technologies to make this happen? 

Yours sincerely
Professor Daniel T Jones

Tuesday 13 June 2006

Too Much Transparency

We are all naturally in favour of greater transparency. We think that if everyone could see the progress of production and levels of stock in the warehouse, as well as shipments and stocks in every warehouse along the supply chain, we should all be better off. We should be able to adjust our actions to changes elsewhere in real time. Add to this the Finance Director’s dream of being able to control everything from a central point and you have the promise of RFID – radio tags on every product telling you where they are at any time. 

But this dream could so easily turn into a nightmare. Just think what happens now. You have plenty of stock in your finished goods warehouse and yet you are always short of the one product the customer desperately needs. So you get on the phone to get production to change their plan and make some of this product in a hurry. Production time and efficiency is lost because you change the plan. People have to scurry round to chase materials and the production of other products is delayed. As a result you are short of those products and the cycle begins all over again. 

In this situation it is easy to blame fickle customers for changing their minds. However there is a more insidious form of variation in orders that is encouraged by greater transparency. If your planners have visibility of all the stock in your finished goods warehouse what is their natural reaction to a run of demand for one product? They change their plan to try to restore stock levels, even if it does not breach the lower limit for stock of this product. 

There is a natural human desire to try to adjust things to the average, even though the point of the warehouse is to absorb variations in demand so these waves do not flow upstream. Why do they do this? Because experience tells them that they never know exactly when production will make another batch of this product – it may not happen for another month or more if the plan gets changed and the next production run gets rescheduled, as it almost certainly will. So better change the plan now rather than wait until you are out of stock. 

Transparency will not actually solve this situation, and could make it a lot worse. Part of the answer is to set the upper and lower stock levels to absorb the variation in demand and stick to them, so these fluctuations are not passed upstream. The other answer is to move away from batch thinking in planning and production and begin to relate the rhythm of production more closely to demand, moving from producing every product once a month to twice a month, and then to every week and maybe twice a week and eventually every day. 

Levelled orders creates the stability that is necessary to start the traditional lean journey in production – improving the capability and availability of each step so you can link them to create flow and then accelerate the rate of flow by improving the frequency. The end result is that production can actually make every product frequently and reliably.

But this is not the end of the story. Sorting out production alone is not enough – you must also sort out your planning logic and behaviour. Just as you eliminate big batches in production you must no longer batch information – it needs to be passed on without manipulation and released to production in small batches frequently. This probably means no longer using your MRP system for production and shipping instructions.

But it probably also means not letting your planners see the stock levels in the inished goods warehouse! We recently witnessed just such a situation – where lanners were only alerted when stock levels breached the upper or lower limit. Even then they learnt not to react too quickly, as they knew that spikes and troughs in demand have a habit of going into reverse very quickly and production is anyhow going to replenish that product in the next period. Doing nothing proved to be the best course of action and eliminated most of the plan changes. 

Imagine this story repeated at many points up the supply chain. Rapid replenishment turns out to be much more important in improving supply chain efficiency than transparency. 

Yours sincerely
Professor Daniel T Jones

Sunday 7 May 2006

Leaning Healthcare

Healthcare is the next great industry to begin the lean journey. The existing model in which the hospital doctor acting as a skilled craftsperson effectively manages their own waiting list of patients, clinics and operations inside someone else’s mass production general hospital is reaching the end of the road. We need to create a vision of what it means to be a lean doctor, what is involved in running a lean health delivery organisation and how the context needs to change to help bring this about.

Recent experience in the UK has shown the problem can not be resolved by spending more money or by increasing capacity and staff. Better outcomes for patients, more satisfying working conditions for staff and lower costs to the tax payer (or members of private healthcare schemes) can only come from fundamentally redesigning the underlying processes for delivering healthcare.

The most important difference between healthcare (and many services) and manufacturing is that the patient is present throughout most of the process, indeed the patient is the product and their problem is the purpose of the activity. If you are a manufacturer just think how different your life would be if your product could experience your process and tell you what it was like!

So healthcare is actually two parallel processes that have to be synchronised: the patient process (which begins and ends at home), the diagnostic and treatment process which mirrors it (in GPs surgeries and hospitals) and several enabling support processes like radiology, pathology, pharmacy, supplies, bed management and theatres.

Healthcare has traditionally focused on the patient doctor interaction and ignored the rest of the patient journey - on waiting lists, searching for a place to park, sitting in queues etc. The introduction of patient choice in the UK is beginning to focus attention on reducing these non value creating steps. Our lean experience tells us that these are also symptoms of lots of wasted time and effort in the diagnostic and treatment processes and in the support processes.

The second characteristic is the huge variety of patients with different conditions coming into the surgery or the hospital. To make sense of this we need to see the different product flows through the healthcare system and begin to manage them separately. What turns out to be critical in defining these flows through a hospital is the length of stay (or the rhythm or takt time in lean language) – whether patients go home that day, stay for a day or two, stay for more than a few days, or whether they need long term care – and then whether they need surgery or other specialist treatments or not (what process routes they follow).

Like manufacturing there is a common assumption that demand is volatile and unpredictable. Experiments with open access to GP surgeries and analysis of people coming into Accident and Emergency Departments shows that demand is actually quite stable and predictable. The greatest variation is in elective work that has been sitting in waiting lists and scheduled and rescheduled many times. Queues (just like inventories) and the scheduling and planning that goes with them actually create significant and unnecessary extra costs throughout the system. The underlying pattern of demand for elective work is also relatively stable.

Having defined the flows (value streams) there is still a strong belief that every patient is different – and cannot be treated like cars going down a production line. However if we sieve the types of problems being treated we quickly see that in each value stream a few problems account for the majority of the work.

Once we create a regular flow of patients with these common problems we can actually free up more time for treating the patients with more unusual problems. Indeed because we have a more predictable process we are better able to tell patients what to expect, and even involve them in managing it.

To create steady flow means starting at the end of the value stream – with discharge! If you are not discharging patients as fast as patients are arriving then the process inevitably gums up. So discharge has to pull patients into beds and through theatres and through admission. This means much greater cooperation between departments, more standard procedures, synchronised test cycles and ward rounds and much clearer and unambiguous handoffs. This is where the lean foundations such as standard work, 5S and problem solving can initially help to improve quality and later as activities are linked to increase the number of patients that can flow through the system. 

We are still at the beginning of the lean journey in healthcare, as courageous pioneers figure out how to do all this in practice. Once we have a better understanding of how lean can transform existing healthcare delivery organisations it will be time to look beyond at innovative new ways of delivering care and at the design of right-sized tools to facilitate them.

In the end healthcare and manufacturing are not so very different. The language and the sequence of changes may differ, but the lean principles work everywhere. Some senior clinicians and chief executives have recently said that “lean can save healthcare”. Manufacturing and service firms and lean experts can help this cause by sharing their knowledge and their experience of lean with local healthcare organisations.

Yours sincerely
Professor Daniel T Jones

Tuesday 18 April 2006

Four Curses

I breathed a huge sigh of relief the other day. We found a bookkeeper to manage the accounts for our rapidly growing business! Lizzie, my Operations Director, and I concluded that we were temperamentally unsuited to the task. Now she can spend all her time managing our busy schedules, workshops and conferences. I can do more useful things between assignments. 

It is amazing how we let our lives get sidetracked from the things we know we ought to be doing, by numbers that tell us to do the opposite. Yet we often feel powerless to change the root cause of this conflict so we can get on doing the right things. Here is my initial list of common curses – I am sure you can think of more.

First come forecasts – which are always wrong, including my own! In this day of electronic point of sale and the ability to transmit real sales data upstream almost instantly, why are we still using forecasts? I so often find that delays in the information flows back upstream are longer than the physical flows. If only we could see how information gets hopelessly distorted the more hands it passes through and the older it gets. Would we act this way if information began to rot like a dead fish?

The answer is not as simple as saying we are only going to react to sales data as they happen. We need to take account of changes in trends and to cover a degree of anticipated fluctuation in real demand. In most cases real end-customer demand is actually very stable and the degree of variation for our high volume products and services is actually quite small. So we ought to at least be able to modify our production plans based on rapid feedback from real sales data as they happen. Our model ought to be picking exact quantities of fresh vegetables in the field today for sale in the store tomorrow, based on the weekly pattern of sales and today’s sales data. 

Second is the curse of Economic Order Quantities. This algorithm is the second source of noise in our information flows. Yet the more we learn about managing lean supply chains the more we see that big batches create extra costs elsewhere in the value stream and lead to chronic instability – which in turn causes fire-fighting, expediting and chasing. The world of perfect information and everything always going according to plan simply does not exist. Batching activities separately across a value stream simply makes things worse as their impact is amplified.

Aligning batch sizes for volume products to daily or at least weekly demand makes flow possible and creates the stability for ongoing continuous improvement. Make low volume products to order separately. The same is true in distribution – picking up and delivering small batches of more products from more suppliers on milk rounds turn out to be cheaper than waiting for each supplier to fill a truck with their own products. How much noise do your systems create for your suppliers?

This leads us to the third curse, chimney costing within a department or function. This assumes that by keeping every activity busy by ensuring there is always work waiting to be done, we optimise the utilisation of every asset, department, piece of equipment or truck.

Simply calculating the OEE (Original Equipment Effectiveness) reveals that it actually results in much poorer utilisation. By concentrating on all the causes of interruption in order to synchronise one step with another and create a flow, we end up with much higher utilisation. We are also beginning to optimise the end-to-end flow of value creation and not optimising each activity in isolation. 

This leads to the fourth curse, standard costing. Just looking at the costs of direct labour and slow freight has led to many mistaken location decisions and much longer supply chains than we needed. If we look at all the costs associated with the end-to-end value stream, including all the costs of managing variation, we would take very different decisions and have much more effective supply chains. And we would not be wasting so much of the world’s energy resources and causing so much pollution! 

Challenging these familiar but mistaken rules of thumb will help us do the right things for our customers, our supply chains and our organisations. 

Yours sincerely
Professor Daniel T Jones

Wednesday 1 March 2006

Developing Problem Solvers

We traditionally see an organisation as a collection of departments or activities, each managed separately and each separated from the rest by inventories or time buffers between them. Performance is improved by setting targets and budgets. When these are not met we change the managers and if that does not work we restructure the organisation. We instinctively reach for structural solutions because they are quick and relatively easy. However the underlying processes and cost structures remain more or less unchanged.

When I walk round any organisation I see it as a collection of customer processes (if it is a service delivery organisation like a hospital), design and production processes (creating the value the customer is paying for) and many support processes that enable these value creating processes to flow. The task is to identify the value in each of these processes, to see and manage the end-to-end flows and to synchronise the support flows. 

If I can not see the end-to-end flow through production, then neither can employees and managers. So the first task is to help them see their processes and to uncover the reasons why they do not flow. Quite often this means looking at the impossibly complex mix of products they are attempting to flow through their processes. It also means challenging the batch logic of their planning systems trying to schedule every product or batch through every operation. Getting over this hurdle creates the conditions where we can begin to flow most products through the entire process. It also creates the stability necessary to develop standard operations in every process step, which is the baseline for continuous improvement.

As well as looking down at individual processes, I also want to fly a little higher and look down at the organisation as a whole. What are the major flows through the organisation and how do all these processes interrelate? I have in mind a fishbone diagram, overlaid on the organisation chart. The value creating processes form the backbone and all the support processes are the fins. Once we can see how an organisation flows then I am sure we will see even more opportunities for improving it. 

The distinctive thing about lean thinking is that it derives from observing best practice organisations and not from theory (which is why academics have such a hard time understanding lean). The lean principles distil the cumulative experience of thousands of people who have spent their working lives solving the problems that enable processes to flow, and to do so in line with customer demand.  

The core expertise required to create and improve processes is a scientific approach to problem solving close to its source. Every problem is an opportunity to improve the process and every problem is also an opportunity to develop your people. The two go hand in hand. 

So the second thing I look for is how good the organisation is at seeing and surfacing all the interruptions and hiccups in their processes. Are these recorded as they occur and what are the processes for responding to them? Are they delegated to an expert group to solve or is everyone involved in some kind of problem solving activity? 

If so, is there a common approach to problem solving across the organisation and a common language for communicating the diagnosis and the results? Is there a policy deployment framework for aligning and prioritising problem solving activities in line with the business goals of the organisation?

More than anything else do managers lead by developing the abilities of their staff to solve problems, at every level in the organisation and throughout their career? Do employees look up to their superiors for the answers to problems or do managers guide their staff to find the right solution by asking the right questions? 

Answers to these questions reveal the real management challenge and opportunity from lean thinking. Process thinking is fundamental to delivering increased value to customers at lower cost. But this in turn relies on an infrastructure for communication and problem solving and a management committed to continually developing the problem solving capabilities of its people, from the top to the bottom.

Yours sincerely
Professor Daniel T Jones

Monday 13 February 2006

No More Lean Excuses

I have recently been getting a striking reaction from many senior management audiences. They all agree that products have got vastly better over recent years, but they equally agree that the process of ordering and buying them and getting them serviced has got worse!

They spontaneously tell me that while they love driving their upmarket German premium brand cars, they will not buy another one because of the terrible experiences trying to get them fixed when they go wrong, which they seem to do all too often. Many of them wonder whether they would have the same experience owning a Lexus, built with Toyota’s fabled quality levels. 

This is in fact a symptom of a deeper problem, from which we can learn a lot. A decade ago as the Japanese car makers began to make serious inroads into world markets, European car makers decided their future lay in coming up with more distinctive designs, adding lots of new technologies, offering a greater range of models and a huge choice of specifications so customers could customise their cars to make them distinctive. Business writers called this mass customisation. For a decade or more it seemed to work. Now the chickens are coming home to roost!

The problem is not with the distinctive designs: when they work they really attract attention, as they do unfortunately when they fail to hit the mark! Adding technology is also not the problem, provided it is thoroughly proven to work flawlessly in the highly demanding environment in which we drive our cars and provided it delivers real value to customers, rather than bewildering complexity. The problem is that we can only really cope with so much choice. As our lives get busier we have less time to deal with all these choices. Beyond a certain point the distinctions between different models and options add little or no value at all.

The real problem is when this complexity begins to negatively impinge on the ownership experience and on the cost base and profits of the producer. It is not difficult to add several thousand pounds of options as you specify your uniquely customised car. However when you come to sell the car, maybe even to the same sales person, ou discover that these options make no difference to the trade in price you are ffered! This leaves a nasty taste in the mouth and makes you very reluctant to epeat the experience. Next time you will probably choose a brand that offers a package that fits your needs. Although the dealer loves the extra profit on the options, these cars often sit around for much longer waiting for the next owner, tying up capital in the meantime.

However the crunch comes when dealers are expected to fix all the problems on this bewildering array of products and options, fitted with unreliable technologies. There is no way they can diagnose and solve all these problems and order and stock all the required replacement parts. Not surprisingly their ability to complete service and repair jobs right first time on time has fallen from the typical average around 60% to nearer 30%. That means two thirds of customers are frustrated and disappointed! And they tell their friends and relatives.

Extended warranties mean that manufacturers are paying for all this. Almost certainly most of the profits they traditionally make on selling expensive options and spare parts are now being lost in ballooning warranty costs. Product proliferation is not the way to compete with the new industry leader, Toyota.

The longer term solution is to go back to the lean basics, to embed quality at source into every step in the design and production process and to review the product range and bundle the options. The short term solution is to improve the parts system and dealers’ ability to fix today’s problems. In Lean Solutions we show how the same lean techniques we use in the factory can dramatically improve car dealers’ ability to get jobs fixed right first time on time. Toyota is now beginning to roll these techniques across its dealer networks across the world. It is surprising how other manufacturers are blind to improving this most frequent point of contact with their customers. Their future will critically depend on how long they take to follow Toyota’s example. Most of them still do not measure the right first time on time experience of their customers.

Yours sincerely
Professor Daniel T Jones

Sunday 29 January 2006

Breaking Through to Flow

The other day I began a speech to a leading supplier of medical devices by congratulating them on the absolutely level demand for their products from existing users and on the steady growth in the number of users. The audience laughed when I asked whether this meant they could plan ahead and never needed to change their plans at the last moment! Like most companies they change their plans every day, and sometimes several times a day.

They nodded in agreement that they and not their customers are responsible for the chaos these short term plan changes cause throughout their extended production and distribution system. The good news is that they ought to be able to do something about it themselves. The bad news is that if their customers knew how much extra cost this chaos causes they would be very unwilling to pay for it! The truth is that they, and many others, are still struggling to understand and deal with the underlying causes of the chaos they are dealing with. It is in fact an obstacle to their taking action to go lean.

The chaos actually begins at the customer interface. In this case the product is part of a diagnosis and monitoring process to manage a medical chronic condition. Mapping the consumption process to obtain repeat supplies will reveal opportunities for saving wasted time for the patient and for the doctor.

Mapping the way the product is ordered and delivered will reveal further opportunities for cost savings and for improving the prospect of your product being chosen rather than those of your competitors. Frequent replenishment will reduce inventories and improve availability while at the same time smoothing order signals. This analysis is too important be delegated to a distributor or wholesaler.

This chaos is then passed up the value stream towards production. In this case it takes over 200 days to reach the doctor through several decision points. Why? I am always struck by how little production people know about what happens down the distribution chain. They do not know how long the chain is, what happens closer to customers and how well the overall system fulfils customer demand. The shocking thing is that it is always longer than you imagine and levels of fulfilment from the customer’s perspective are surprisingly low, despite all the inventories in between. This is a sure sign that no one is responsible for redesigning the end-to-end value stream.

But the real culprit that is causing most of the chaos in production is the fact that our planning systems are driven by batch logic (based on economic order quantities) which depends on perfect information. We also believe we must plan every event for every product in the same way. Every time things go wrong we make a new plan and when this does not work we change it again and again. As a result fire-fighting is endemic and production efficiencies are significantly degraded.

A way out of this dilemma is to recognise the damage being done by this batch logic and to learn to see that you can in fact quickly create stability and flow for the few high volume products which account for much of your output. These need to be managed separately from the tail of build-to-order products with low volume and unpredictable demand.

Begin by creating a replenishment pull for these high volume products, absorbing demand variation in a finished goods buffer stock and initially producing them on a fixed volume, fixed sequence cycle. This creates the stability necessary to start down the lean virtuous circle of standard work and continuous improvement. It also allows much faster progress in improving equipment availability, shorter changeover times and integrating production steps into a continuous flow. Over time speed up the cycle, reduce batch sizes and incorporate more products into this flow, and as your capabilities improve vary the volume and the sequence to more closely mirror daily demand.

This path very quickly leads to increased output, near perfect on-time deliveries, much higher employee involvement in continuous improvement and it can be replicated up and down the value stream. You are no longer producing to forecast and no longer need so many planners to rejig the schedule for most of your production. And you will discover that true responsiveness comes from establishing stability and increasing the rhythm throughout the value stream, not from changing plans all the time. Chaos is not inevitable and can be conquered.

We have seen this work in so many different environments where you have a complex mix of products with variable work content or production volumes; from separating different types of service jobs in a car service shop to dealing with different types of insurance claims to separating simple routine from infrequent and difficult operations through hospital theatres. Ian Glenday has now written a workbook to enable everyone to try out this method, called Breaking Through to Flow . This is our first LEA publication and I am confident it will help many of you take the next leap on your lean journey.

Yours sincerely
Professor Daniel T Jones